Pipe strategy
Route the pressure, waste less pipe, and seal the cap before the board runs dry.
Choose from a rolling queue of pipe pieces, connect the source to the cap, and keep your score high by building a tight route with minimal leaks or wasted parts.
Queue-based routing
Pick from three upcoming pieces, then commit that tile to the board. Every placement changes the next decision.
Efficiency scoring
Reachable pipes and matched connections add points. Isolated junk and leaks strip the run back down.
Tight move budget
You only get twelve placements per delivery. Clean routes preserve enough budget for a bonus finish.
How it scores
Useful connected pipes score up, while isolated pieces and leaks cut the run back down.
Each run starts with a fresh cap row on the right wall. Connect the source on row 3 to that cap using the existing SVG pipe pieces, and try to finish with placements left for the bonus.
Loading run
Priming the pipeline
Preparing a fresh delivery route and queue of random pipe pieces.
